欧美日韩在线观看成人,www.激情综合网激情五月,色喷水人妻,中文字幕黑人大鸡巴操人妻

您好,歡迎來到濟南通宇恒成自動化工程有限公司網(wǎng)站!

服務熱線

當前位置: 首頁- 新聞中心 > 客戶見證
常見問題
新聞中心

MNS低壓配電柜安裝規(guī)范是什么?

發(fā)布時間:2021-05-17 來源:http://j1bl.cn/ 瀏覽量:

1.安裝前對準備工作的檢查
1. Check the preparation before installation
在安裝前,MNS低壓抽屜柜監(jiān)理工程師及甲方工程師要檢查進場道路是否暢通,必要時要求要求總包單位修建簡易運輸通道與各安裝點連接,施工場地布置應滿足文明施工的要求。同時還應檢查安裝單位的施工機具安排狀況,督促安裝單位對施工機具進行檢查,確保狀態(tài)良好。壓設備到達現(xiàn)場前,配電室、地溝、基礎槽鋼應已完全竣工
Before installation, the supervision engineer of MNS low-voltage drawer cabinet and the engineer of Party A shall check whether the access road is smooth. If necessary, the general contractor is required to build a simple transportation channel to connect with each installation point, and the construction site layout shall meet the requirements of safe and civilized construction. At the same time, the arrangement of construction machines and tools of the installation unit should be checked, and the installation unit should be urged to check the construction machines and tools to ensure that they are in good condition. Before the pressure equipment arrives at the site, the distribution room, trench and foundation channel steel shall be completely completed
1)、配電室
1) . distribution room
配電室:配電室施工前,低壓配電柜要將建配電室所需的詳細圖紙交予施工方(合同簽訂后2周內(nèi),重 點要落實客戶對圖紙的位置、內(nèi)容、完成時間確認),并且在配電室建設過程中,我方或協(xié)作單位的技術人員要在現(xiàn)場監(jiān)督,避免施工錯誤。(配電室建設大約需2周左右)
Distribution room: before the construction of the distribution room, the low-voltage distribution cabinet shall submit the detailed drawings required for the construction of the distribution room to the construction party (within 2 weeks after the signing of the contract, the key point is to confirm the location, content and completion time of the drawings by the customers), and during the construction of the distribution room, the technical personnel of our party or the cooperating unit shall supervise on site to avoid construction errors( It will take about 2 weeks to build the distribution room)
                           MNS低壓抽屜柜
2)、地基:MNS低壓抽屜柜槽鋼安放位置要與配電室預留的設備風道相對應,設備離墻的小距離要明確(距離太近,設備的柜門打不開)。(槽鋼焊接大約需2天,我方技術人員必須到場指導)
2) Foundation: the channel steel of MNS low-voltage drawer cabinet should be placed in the position corresponding to the equipment air duct reserved in the power distribution room, and the small distance between the equipment and the wall should be clear (the distance is too close to open the cabinet door of the equipment)( It takes about 2 days to weld the channel steel, and our technicians must be present for guidance.)
設備到達現(xiàn)場:
Equipment arrival at site:
3)、若配電室、地基若未建好,低壓配電柜設備要有存放位置(要防雨或提供必要的防雨材料)。
3) If the power distribution room and foundation are not built, the low-voltage power distribution cabinet equipment should have a storage location (rain proof or provide necessary rain proof materials).
2.安裝
2. Installation
2.1各配電房門窗須嚴密,低壓配電柜房內(nèi)清潔。
2.1 the doors and windows of each distribution room shall be tight, and the low-voltage distribution cabinet room shall be clean.
感謝您的閱讀,希望以上內(nèi)容對您有所幫助,如您想了解更多精彩內(nèi)容請點擊我們的官網(wǎng):MNS低壓抽屜柜http://j1bl.cn。
Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: MNS low voltage drawer cabinet http://j1bl.cn .

熱門產(chǎn)品 / HOT PRODUCT

首頁首頁 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
国产大屁股熟女视频| 大黑屌VS中国人妻中文字幕| 插逼丝袜网站| 超碰av综合| 亚洲熟妇10P| 插入美女逼网站| 日韩经典伦理一区二区| 一区二区偷拍夫妻高清不卡av| AV在线综合一区| 大鸡巴狂干小瘙逼| 女人的骚逼视频免费不卡| www.18禁| 午夜av红桃| 欧美性爱亚洲综合极品香蕉久久网| 美女嫩逼被操得直流水视频| 性爱色吧91在线| 欧美日韩在线a一区| 青青草热视频| 香蕉视频老湿机在线观看影院APP| 秭归县| 欧美中文字幕一区二区在线观看| 亚洲精品熟女HD| 操老熟妇大骚逼| 深爱五月份激情综合| 深爱激情日韩欧美| 操逼视频嗯啊嗯啊嗯啊嗯啊| 熟女毛逼色| 鸡巴操穴网站| 亚洲美妇天堂| 在线播放网站欧美| 骚逼淫荡AV| 三上悠亚无码av天堂| 偷拍xxx福利视频| 国产精品久久久久久久久18美女禁| 国产少妇操| 中文字幕在线一二三四成人| 久久性爱視频| 国车少妇在线播放| 最新免费av导航一区二区| 亚洲网黄官方入口| 在线一区二区蜜臀|